Sahaj Solar Pvt Ltd

BLOG

October 30, 2021

India Renewable Energy outlook and opportunities for Sahaj

  • A target of installing 100 GW of grid connected solar power by 2022 (achieved till 2019- 28.10GW).
  • India’s solar target till 2030 - 260 GW, so Installation required per year 25GW.
  • Highest installation achieved by India in a year 12GW in 2018.
  • 4 Lakh Solar pump annually by EESL and separate schemes by some of the states for pumping as well as PHE projects amounts to Rs. 9000 Cr.
  • Additional Growth from scaling up of EV market and remote charging stations
  • Annual deficit of production V/s consumption is 14GW based on existing situation
  • Annual gap will reduced by 10GW incoming years by introduction of high efficiency modules production in India and due to anti-dumping duty.
  • Global consumers from USA/CANANDA/EUROPE/AUS are looking towards India for export of modules.
  • SR No Year Capacity added during F.Y. (MW) Cummulative Capacity (MW)
    1 Upto 2010 8.54 11.35
    2 2010-11 24.58 35.93
    3 2011-12 896.37 932.3
    4 2012-13 752.16 1684.46
    5 2013-14 947.46 2631.93
    6 2014-15 1112.07 3743.97
    7 2015-16 3018.88 6762.87
    8 2016-17 5525.98 12288.85
    9 2017-18 9362.63 21651.48
    10 2018-19 6529.2 28180.68

    Leave a Reply